Thank you

We will contact you soon

Whoops

There was problem
Get in touch
Field is required
Field is required
We use our own and third-party cookies to improve your experience and our services, and to analyze the use of our website. If you continue browsing, we take that to mean that you accept their use + Info We use our own and third-party cookies to improve your experience and our services, and to analyze the use of our website. If you continue browsing, we take that to mean that you accept their use + Info
ENG
Geo Rus

GreenHill Residence

Block 2
Greenhill Stage 2 - Completed
Status:
Done.
Back
Floor:
1
2
3
4
5
6
7
8
9
10
11
Apartment.
Floor.
Total m2
Price.
Ap.
m2
Price.

Space Range m2

From
to

Price Range ₾

From
to

The Project

Stage 4 - Under Construction
Stage 3 - Under construction
Stage 2 - Completed
Stage 1 - Completed

Rooms

1 Rooms
2 Rooms
3 Rooms
4 Rooms
5 Rooms
Big space

Unit Type

Apartment
Commercial
Office
Parking
More options
Show less
Call now

About Project

The construction of the second stage of the multifunctional complex "GreenHill" has already started and will be completed in 2022. The complex is being built in Tbilisi, in an ecologically clean and cozy environment. It is distinguished by its unique planning, comfort and greenery. Each apartment in the complex has an individual plan; Accordingly, the buyer can choose the accommodation within the desired price-range and decorate it according to their own taste.

The building of the second stage of the project consists of four blocks. Blocks I, II and III are residential, although their first floors will be intended for office and commercial spaces. Block IV will be entirely dedicated to office space. Blocks I and III will have 9 storeys; Block II - 11 storeys; Block IV - 6 storeys.

Elevators - 2 high-quality elevators - passenger and service - will be installed in each entrance of the complex.

Entrance - All entrances of the complex will be decorated tastefully and in full compliance with safety standards:

  • The walls and stairs will be dressed in stone;
  • Metal railings will be made;
  • Automatic water pumps will be installed individually for all entrances;
  • Hanging metal ceilings and energy-efficient LED lighting will be installed on all platforms and corridors;
  • Each entrance will be adapted for people with limited abilities.

 

Facade system - the outer walls of the facade will be built with 30 cm energy-efficient pumice block, 9-chamber, acoustic thermal insulation. The interior partition walls are also made of acoustic, 4-chamber, 10 cm concrete block.

 

Safety - For safety reasons, the complex includes metal fireproof evacuation doors on all floors and stairwells are designed in full compliance with fire safety norms.

 

Frame - The frame of the building is a monolithic building of reinforced concrete; The monolithic reinforced concrete slab is used as the foundation, and the engineering base is made of combined drill bits and artificial base compacted into layers of sand-gravel mass. The official supplier of the concrete mixture is HeidelbergCement.

Continue reading
Show less